Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | a19cyclingimprovements, bootham, cobbles, cyclelane, cyclelights, cyclelogo, cyclespecificlights, hatching, notyetinoperation, scarboroughbridgetoboothamparkcyclerouteimprovementsscheme, york |
Date time: | 11.36am, Thursday 8th September, 2022 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[UPDATE: 7.2.23 The cycle lights are now in operation: #190860] [Image taken 8.9.22] Bootham, York. Context and links: #186051. Looking ahead to St Mary’s – the continuation of the Scarborough Bridge to Bootham Park cycle route in the direction of the rail station. The cycle specific lights are not yet in operation. I hope they have a long crossing phase - getting over the junction from a standstill will take time on heavier cycles. And the cobbles will add a hazard, create an additional barrier and slow people down.
Comments reflect the views of the original submitter only.